Concrete and reinforcement · throughout Estonia
Reinforcement, formwork and concrete in one controlled pour.
A successful concrete pour depends on preparation. Before delivery, formwork, dimensions, levels, reinforcement, cover, penetrations, logistics and weather conditions must be checked.

01 / Scope
What can the work include?
Concrete and reinforcement work throughout Estonia: project-led reinforcement, formwork, pre-pour checks, placement and curing.
- 01Project-specified formwork and reinforcement
- 02Checks of cover, ties and penetrations
- 03Coordination of concrete, pump and work sequence
- 04Placement, compaction, finishing and curing
02 / Input
What should you send for an accurate quote?
Everything does not have to be final. Send what you have and note which documents or decisions are still missing.
- 01Structural design and reinforcement drawings
- 02Concrete strength class and other requirements
- 03Pour quantities, access and pump position
- 04Requirements for finish, curing and documentation
03 / Next step
A clear path from design to construction.
- 01We review the required drawings
- 02We prepare a pre-pour checklist
- 03We coordinate delivery and placement
- 04We document the work and arrange curing
Quote request
Start an enquiry